The Georgetown Branch: Gallery: 01_05_03-demolition More demolition today. Mainly ripping down panels from the HVAC / water heater cabinet and patching some holes below the eastern window. (* For the sake of simplicity, we'll refer to east, west, north & south in relation to the room layout plan with north being the top.) Click on a link to view large image. |
|
01_05_03-demolition_01.jpg Northeast view: HVAC / water heater cabinet w/ paneling removed. Nails still to be pulled. |
|
01_05_03-demolition_02.jpg Northwest view: cabinet from the other side. |
|
01_05_03-demolition_03.jpg More progress. |
|
01_05_03-demolition_04.jpg Totally bare cabinet w/ one stud removed, to the left. |
|
01_05_03-demolition_05.jpg View northwest. One can see the area below the window where I removed a board from the wall revealing many chunks of masonry missing below the sill. The windows are relatively new. I used GE's Concrete & Masonry silicone sealant in a caulk gun to touch this up - below the window sill. |
|
home | news | history | layout | equipment | gallery | links | contact |
|
email: cpl_clegg@yahoo.com |