The Georgetown Branch: Gallery: The paneling is finished 01/11/2004- All of the paneling is up! Bruce lent a hand again (THANKS Bruce!) and we got the rest of the white paneling up on the walls. I still have to put some trim pieces in the corners and some small vertical trim areas, but the major stuff is done. Next up I will install conduit for the electrical boxes to be mounted on the walls and then its on to drop ceiling. |
|
01_11_04-basement01.jpg Overall from far end of room. |
|
01_11_04-basement02.jpg Area under stairs where helix will eventually be. |
|
01_11_04-basement03.jpg Now from door end of room. |
|
01_11_04-basement04.jpg And a view of the door and corner. |
|
home | news | history | layout | equipment | gallery | links | contact |
|
email: cpl_clegg@yahoo.com |